Component root-cause analysis / predictive deep-dive
AI mode: ON Synthetic demonstration data — not operational
Aircraft SB-1067 · Su-30MKI · No. 122 Sqn 'Ravens' · AFS Himgiri · Central Air Command
Component Fuel Control Unit High · predicted failure mode: Metering-valve drift
← Back to dashboard
Model risk score 82.6/100 predictive maintenance model
Predicted RUL 1d remaining useful life
Health index 22/100 telemetry-derived
Model confidence 97% evidence density
Open snags (tail) 1 unscheduled, open
Aircraft status AOG 786 flt hrs · 5y old
AI root-cause analysis
Generating AI analysis…

Predicted failure mode

Metering-valve drift — leading signals: fuel-flow scheduling error.

See the Predictive model tab for the substantiating data points and the Maintenance & spare tab for history and the prescriptive action.

Health degradation & failure projection

telemetry-derived health index · signals: fuel-flow scheduling error

Why — model risk drivers

Feature attribution — substantiating data points

contributions sum to the 82.6/100 risk score
Risk driverWeightSeverityContributionSubstantiating evidence
Failure imminence 28% 98% 27.5 pts ~1d to predicted failure
Health-index deficit 30% 78% 23.4 pts health 22/100
Component criticality 14% 100% 14.0 pts High
Recent unscheduled snags 12% 100% 12.0 pts 7 unscheduled events on tail
Spare exposure 3% 100% 3.0 pts 0 on hand, lead 54d
Cumulative duty (flight hrs) 8% 22% 1.7 pts 786 flight hrs
Airframe age 5% 20% 1.0 pts 5 yrs (inducted 2021)
🔒 Source: components · maintenance_events · aircraft · spares — model: gradient-weighted risk attribution · governed & traceable

Maintenance activity — SB-1067

scheduled vs unscheduled events per month

This component — Fuel Control Unit

4 events
DateTypeSeverityStatusDowntime
2026-05-26Unscheduled Critical Open 161.2h
2026-01-05Unscheduled Low Closed 19.4h
2025-10-24Unscheduled Med Closed 17.9h
2025-10-02Unscheduled High Closed 34.4h

Full aircraft history

8 events
DateComponentTypeSevStatusDT
2026-05-26Fuel Control UnitUnsch Critical Open 161.2h
2026-03-23Brake AssemblyUnsch Low Closed 108.4h
2026-01-05Fuel Control UnitUnsch Low Closed 19.4h
2025-10-24Fuel Control UnitUnsch Med Closed 17.9h
2025-10-02Fuel Control UnitUnsch High Closed 34.4h
2025-07-27Pitot-Static ProbeUnsch Med Closed 66.9h
2025-04-27Pitot-Static ProbeUnsch Med Closed 78.1h
2024-12-14Brake AssemblySched Med Closed 68.9h

Lead-time history

12 months · current 54d

Stock on hand vs reorder

current 0 · reorder 2

Required spare & prescriptive action

Required spare
Fuel Control Unit
on hand 0 · reorder 2 · lead 54d · High
Stock is at/below reorder and lead time has risen to 54 dayspre-position Fuel Control Unit at AFS Himgiri now to avoid an AOG when the component is pulled.

The same chain is visible fleet-wide on the diagnostic drill-down.

Monthly receipts & consumption

MonthLead timeOn handReceivedConsumed
2025-0748d7 66
2025-0848d4 73
2025-0948d7 53
2025-1047d6 46
2025-1148d4 117
2025-1248d3 56
2026-0151d5 65
2026-0252d1 34
2026-0352d3 44
2026-0452d2 86
2026-0553d2 86
2026-0654d0 06